RESTORATION OF MINING RAMBLAS

Hydrological Forestry Restoration to reduce the risk of flooding and the environmental improvement of the Las Matildes, Beal, Carrasquilla and Ponce ravines

This project will be implemented in the Las Matildes, Beal, and Carrasquilla ravines, as well as the Ponce ravine, which originate in the Sierra Minera mining area of La Unión and Cartagena and flow into the Mar Menor lagoon. The objective is to reduce the risk of flooding and improve the environmental condition of these ravines and, consequently, the Mar Menor. The proposed actions aim to reduce water velocity, thereby mitigating erosion, and to regulate flows, thus facilitating sedimentation. To achieve this, the project includes the restoration or creation of floodplains, the restoration of channel morphology, hydrological correction (dams), and vegetation restoration.
This set of projects is complementary to the restoration of areas affected by mining.
The implementation projects are developed in two phases, depending on whether action is taken on the Public Water Domain (Phase 1) or on areas adjacent to it (Phase 2).

Phase 1 - Actions on the Public Water Domain of the mining ravines

The actions include, on the one hand, hydraulic works to correct the riverbeds that allow the retention of sediment and the mitigation of floods and, on the other hand, plantings for their renaturalization.

Milestones achieved

The construction and planting have been completed.

Latest developments

Only the aforementioned maintenance and replacement work remains until September 2026.

Phase 2 - Actions adjacent to the Public Water Domain

This phase incorporates larger flood control and flooding zones. It is being developed through three projects: one in the Beal ravine, another in the Las Matildes ravine, and another in the Carrasquilla ravine and the Ponce ravine. All three projects have been analyzed by the Project Supervision Office and adapted to the observations in that office's report.

Latest developments

The most advanced projects are those for the Carrasquilla and Barranco de Ponce ravines and the Las Matildes ravine. Both have already been awarded.

Actions in the Public Water Domain: construction of dikes Actions in the Public Water Domain: construction of dikes Actions for the hydrological and forestry restoration of the Ponce ravine Hydrological and forestry restoration actions in the Las Matildes ravine
Dentro de la medida 2.2 del MAPMM

Entidad responsable

Segura River Basin Authority

Presupuesto del proyecto

Fase 1- 8,37 M€; Fase 2- 17,50 M€

Superficie

Fase 1-32 Km de cauce ; Fase 2-73,57 ha.
Map of the location of the actions in the mining ravines